What's New

Notification: Briefing Session on Open Request for Technical Ideas for“Safety Enhancement for LWRs”Program in FY2012 -“R&D program for Plant Safety Enhancement”

Purpose:

In light of the lessons learned from Fukushima Daiichi Nuclear Power Station Accident, the purpose of the “Safety Enhancement for LWRs” subsidy program developed by the Agency for Natural Resources and Energy is to promote research and development aimed at enhancement of safety measures at commercial power-generation reactors.

In order to promote technical development through acceptance of wide-ranging expertise and experience from industries outside of the nuclear industry, ideas with the potential to solve technical problems are sought for the “Safety Enhancement for LWRs - R&D program for Plant Safety Enhancement -” in FY2012. This program will be jointly conducted by THE INSTITUTE OF APPLIED ENERGY, TOSHIBA CORPORATION, HITACHI-GE NUCLEAR ENERGY, LTD., and MITSUBISHI HEAVY INDUSTRIES, LTD.

The Briefing Session on the Open Request for Technical Ideas will be held as outlined below:

Documents:

  1. Project summary and application procedures(PDF:204KB)
  2. Respective technical development themes and open request specifications(PDF:4.1MB)
  3. Guidance poster(PDF:181KB)
  4. Detailed program(PDF:65.7KB)
  5. Proposal format(Deadline: 15:00(JST) on Monday, October 29, 2012)

Time and Date:

13:30 - 17:30 on October 3 (Wed.), 2012

Location:

Conference rooms, 7th floor, Koku Kaikan (1-18-1 Shimbashi, Minato-ku, Tokyo)
Koku kaikan access map(PDF:57.7KB)

Program:

Session 1
Briefing session on project summary and application procedures: 13:30 - 14:20
Opening speech
Project summary and application procedures
(break)
Session 2
Respective technical development themes and open request specifications: 14:35 - 17:30
■ Room 1
Development of evaluation method for seismic isolation system
Enhancement of integrity evaluation method for containment vessel structure
Development of passive containment cooling system (PCCS)
Development of passive debris cooling system
■ Room 2
Development of In-vessel retention (IVR) of molten debris
Safety enhancement of reactor core
Safety enhancement of steam generator
Enhancement of safety systems

Registration:

If you wish to participate in this session, please send an email by October 1 (Mon.) to the mail address shown below. Please include your name, corporation, address, and preferred room for Session2 in the body of your email message. If there are too many applicants, we will send an acceptance mail on October 2 (Tue.), advising that participation will be restricted to only one person per group.

Participation in the briefing session is not a prerequisite for proposal submission.

[Mail Address] e-idea@iae.or.jp
[Subject] (Participation) briefing session

Note:

Handouts for distribution in the briefing session will be prepared in Japanese and English. The presentations in the session will be given in Japanese only.

Contact Information:

Nuclear Energy Policy Planning Division,
Agency for Natural Resources and Energy
Hirayama, Kuwahara
+81-3-3501-1991

Back to Archives